Drinking Water Treatment Plant

CASE STUDY

drinking water treatment plant ozone

The settlement areas around Yusufeli district of Artvin will be flooded due to the construction of Turkey’s largest and the world’s 3rd highest dam. We have completed the Ozone generator and Ozone system installation in the Drinking Water Treatment Facility built by DSI (State Hydraulic Works) 26th District in the new settlement where these residential areas will be moved.

With this project, we have succeeded to provide clean, disinfected water to the people of Artvin region. We would like to thank all our business partners, Altyapı A.Ş, DSI and all our business partners who helped us participate and succeed in such a valuable project.

Equipment List

Ozone Generator
– Dry Air Preparation System (1 original, 1 stand-by)
– Compressor (1 main, 1 stand-by)
Ozone Destruction System
– Ozone Measurement System (Balance and Concentration)
– Diffuser

GET A QUOTE

Contact us to get the best prices and lease options.

TALK TO AN EXPERT

Get a free consultation today!